Spar Winford

Flagship redevelopment of Spar Winford.

The development included the following works;

  1. Liaising with Clients on design and layout of store
  2. Strip back existing retail area to block/stud walls
  3. Installation of new ceramic floor 200sqm
  4. Installation of Stud Walls
  5. Installation of Refrigeration
  6. Installation of Pack System (to run new refrigeration)
  7. Installation of Chilled and Frozen Coldrooms
  8. Installation of new joinery including Counter, perimeter boarding and end panels
  9. Installation of new shelving
  10. Installation of new FTG Prep Area
  11. Installation of new suspended ceiling
  12. Installation of Plumbing

Project duration: 10 Days (3 days closed)